Skip to main content

Project Management

The system provides a clear overview for managing projects and folders. The main view includes list and card layouts, quick filters, a search bar, and project and folder operations.

✅ Advantage
Flexible views and quick filters make it easy to search and organise even large numbers of projects.

TreeDetect project management interface showing list and card view

Key Features​

  • Create project: start a new processing project by entering a few basic details.
  • Create folder: create thematic containers for organising projects. Ideal for scheduling multiple surveys of the same area over time.
  • Switch view: choose between list or card view.
  • Filter and search: quick filters by location, type, and status + full-text search.

Views​

List View​

Columns: Name, Location, Photo/LiDAR (data source type), Created, Status, Actions.
All key commands are accessible from the actions menu at the end of each row. Clicking on a project row opens the project page.

Card View​

Project basics are prominently displayed (description, location, role, type, creation date), with a status badge in the header.
An open button at the bottom of the card navigates to the project page.


  • Quick filters: Location, Type, Status (multiple conditions can be combined).
  • Search: by name and additional metadata.
  • Filter persistence: applied filters are retained when switching between views.

Statuses​

  • Planning: project is under preparation
  • Processing: data processing is in progress
  • Report ready: all results and reports are available

Project and Folder Operations​

The menu on the right side of each row/card:

  • Details: open the project's detail page (results, visualisations, files).
  • Share: share with users and set permissions.
  • Move: move the project to another folder.
  • Edit: modify basic data (name, description, type, etc.).
  • Delete: the project is moved to the Trash folder, where it can be restored or permanently deleted within 7 days. After 7 days, the project is automatically and irrevocably deleted.
Deleted project

⚠️ Warning
Projects permanently deleted from the Deleted folder, or automatically removed after the 7-day period, cannot be restored.


Data Source Type​

  • LiDAR: processing based on georeferenced point cloud.
  • Photo: point cloud generated from photogrammetric processing.

The type is displayed in both list and card view, giving a quick overview of the project technology.